Technical Resumes
Sample 12




"Professional Resume Writing Services" - Click Here

"Instant Cover Letters" - Click Here


Amy Mathews, 117 River St, Boston, MA 02127

Phone (617) 247 8459 Cell (617) 847 1269

E-Mail: mathewsa@hotmale.com

 

OBJECTIVE: Seeking an Engineering position where my knowledge and experience can be developed and utilized fully.

 

CAREER PROFILE:

1.       Creative with effective organizational abilities and interpersonal skills.

2.       Strong planning, coordinating and problem solving abilities.

3.       Ability to work under pressure in fast-paced, time-sensitive environments.

4.       Experienced at analysing and streamlining systems and operations to increase productivity.

5.       Proven ability to manage projects from planning through to execution.

6.       Catalyst for change, transformation and production improvements.

 

EXPERIENCE

Drummond Medical Inc., Quincy MA
1999 – 2002

Industrial Engineer

1.       Designed and implemented effective lean production processes.

2.       Created a database, which monitored the validation and calibration of all production equipment.

3.       Responsible for increasing productivity through combined work steps, removing non-value added tasks, adding automation and the development of effective work practices.

4.       Responsible for sourcing equipment through external vendors.

5.       Performed time studies on production equipment to establish production bottlenecks.

6.       Monitored equipment downtime and implemented corrective action procedures.

7.       Developed a set of guidelines to reduce costs in the division through value improvement programmes.

Beacon Hill Industries Boston MA
1997 – 1999

Associate Industrial Engineer

1.       Monitored equipment utilisation and machine downtime with responsibility for the implementation of corrective and preventative actions.

2.       Tracked yield loss per machine deviation, coordinating yield improvement groups to gain a 6% yield improvement.

3.       Performed equipment installation checks and validations on new production equipment.

4.       Created an effective filing system to maintain equipment validation data and calibration data.

5.       Participated in a lean manufacturing programme, implementing improved production methods through more effective use of automation.

6.       Assisted the technical staff with equipment utilisation and maintenance.

South Park Industrial, Quincy, MA
1996 – 1997

Graduate Engineer

1.       Created installation checklists for new production equipment.

2.       Assisted with the validation of equipment.

3.       Monitored machine utilisation, providing detailed weekly reports on machine downtime.

4.     Trouble-shooting activities included regular performance checks and trending of yield fallout to determine weak areas.

5.     Created Auto-CAD drawings and created Document Change Orders to facilitate production needs.

 

EDUCATION

Massachusetts Institute of Technology (MIT)
Boston MA
1994 - 1997

BS in Industrial Engineering

 

ADDITIONAL INFORMATION

Interests include Tool Making and Carpentry. In my spare time I also enjoy drawing, art and reading.


"Instant Cover Letters" - Click Here

"Professional Resume Writing Services" - Click Here







 Email This Page!



Job Search